Sunday, 1 May 2016

Daftar Pesawat Terminal 1 & 2 Juanda Surabaya


April 2, 2016
Daftar Pesawat Terminal 1 & 2 Juanda Surabaya

juanda

Mulai tanggal 14 Pebruari 2014 telah di lakukan perubahan pada Bandara Juanda dengan di fungsikannya Terminal 2 (T2) Bandara Juanda Surabaya mulai dioperasikan. Terminal 2 atau T2 Juanda adalah terminal lama Bandara Juanda yang telah direnovasi. T2 Bandara Juanda nantinya dipakai untuk semua penerbangan internasional dan sebagian domestik yaitu untuk maskapai Garuda Indonesia, AirAsia dan Mandala Tiger.

Untuk lebih detilnya berikut ini letak dari beberapa maskapai penerbangan yang menempati T2 Juanda :

T2 Internasional

    Lion Air (Singapore)
    China Airlines
    Singapore Airlines
    Eva Air
    Cathay Pasific
    Jetstar / Value Air
    Garuda Indonesia

T2 Domestik

    Garuda Indonesia
    AirAsia
    Mandala Tiger

Sedangkan maskapai penerbangan yang masih menempati Terminal 1 atau T1 Bandara Juanda adalah :

    Citilink Domestik
    Sriwijaya Domestik
    Batik Air Domestik
    Lion Air Domestik

Bila anda telah memesan ticket, jangan lupa perhatikan pesawat anda berada di terminal yang mana ya jangan sampai keliru.

Tuesday, 12 January 2016

Ukuran/dimensi Standart Container/peti kemas

Ukuran/dimensi Standart Container/peti kemas

Pada umumnya container sudah memiliki ukuran standart internasional, salah satunya “Container 20 ft” seperti terlihat pada gambar berikut. artinya panjang dari container tersebut adalah 20 ft. untuk ukuran lebar dan tingginya biasanya hampir sama, perbedaannya hanya pada panjang container tersebut. secara umum yang banyak kita temukan asalah container dengan ukuran 20 ft dan 40 ft.

Berikut adalah beberapa ukuran standart dari container: Download Dimesion of Container



Saturday, 3 May 2014

7 Manfaat Menakjubkan Semangka Bagi Tubuh Anda

Semangka merupakan jenis buah berair yang sebagian besar jenis daging buahnya bewarna merah. Buah ini sangat cocok di konsumsi di saat udara terasa sangat panas atau di siang hari yang cukup terik. Ini dikarenakan, hampir 90 persen kandungan semangka terdiri atas air. Buah ini mudah di dapatkan di pasar tradisional maupun di pasar yang lebih modern. Sebagian besar dari kita tentu menyukai mengkonsumsi buah berair tersebut. Namun, di samping penganti penghilang dahaga, banyak sekali manfaat buah semangka bagi kesehatan tubuh anda. Lalu, apa saja manfaat menakjubkan semangka bagi kesehatan tubuh tersebut...???

    Sahabat, tips kesehatan. Warna merah pada semangka menandakan bahwa buah ini mengandung berbagai nutrisi, vitamin, mineral, kalium, betakaroten, vitamin C dan serat yang dibutuhkan oleh tubuh. Oleh karena itu, mulailah menyediakan semangka sebagai salah satu makanan penutup di setiap menu harian anda. Kandungan berbagai nutris dan vitamin yang melimpah pada semangka membantu menjaga dan mempertahankan kesehatan tubuh setiap orang. Tips kesehatan kali ini akan mengungkapkan berbagai manfaat semangka yang mungkin belum anda ketahui. Berikut ini 7 manfaat menakjubkan semangka bagi kesehatan tubuh anda :
Jantung Yang Lebih Sehat. Buah semangka merupakan sumber likopen. Likopen yang terkandung dalam buah semangka berperan penting untuk menjaga kesehatan organ jantung yang anda miliki.Mata Yang Lebih Sehat. Ini dikarenakan, buah ini mengandung betakaroten yang akan di ubah didalam tubuh menjadi vitamin A. Vitamin A merupakan vitamin yang akan menyehatkan organ penglihatan anda.Meningkatkan Sistem Kekebalan Tubuh. Semangka juga merupakan sumber vitamin C. Vitamin C memiliki fungsi membantu meningkatkan sistem imun tubuh. Sehingga tubuh tidak akan mudah sakit di saat cuaca kurang baik atau sangat ekstrem.Perlindungan Dari Radikal Bebas. Berbagai asap pabrik, asap kendaraan bermotor serta udara kotor yang terhirup dapat memicu masuknya radikal bebas yang bisa mengancam kesehatan tubuh anda. Semangka mengandung senyawa karotenoid yang dapat menetralisir radikal bebas yang masuk ketubuh seseorang.Memperkuat Tulang Tubuh. Ini dikarenakan, semangka merupakan salah satu buah yang kaya akan kandungan kalium. Kalium ini berfungsi untuk mempertahankan kalsium dalam tubuh. Sehingga tulang dan sendi akan lebih sehat dan kuat sepanjang waktu.Organ Ginjal Yang Lebih Sehat. Mengkonsumsi buah semangka akan membantu meningkatkan aliran urine. Dengan lancarnya aliran urine maka akan berdampak pula pada kesehatan organ ginjal di didalam tubuh.Mengurangi Lemak Pada Tubuh. Semangka merupakan jenis buah yang kaya akan kandungan citruline yang mana berperan mengurangi lemak berlebih yang berada di dalam tubuh anda.      Demikianlah tips kesehatan yang membahas 7 manfaat menakjubkan semangka bagi tubuh anda. Semoga bermanfaat dan berguna bagi pembaca semua. 

Monday, 21 April 2014

Macam Survey Kapal


Ada beberapa macam survey kapal berdasarkan periode waktunya, yaitu
1. Annual Survey (AS)
Dilakukan tiap pengulangan tahun setelah kapal diluncurkan, dalam siklus 5 tahun survey. Annual survey dapat dilakukan 3 bulan sebelum atau sesudah tanggal jatuh tempo.
Dan jika dalam waktu 6 bulan tersebut belum dilakukan annual survey, maka sertifikasi dari klasifikasi menjadi tidak berlaku.
(LR Rules & Regulation Part 1, Chapter 2, Section 3 ; 3.51,  Jan 2007)
2. Intermediate Survey (ITSS)
Survey ini dilakukan saat / di antara jangka waktu annual survey yang kedua dan yang ketiga. Dan dapat dimulai sangat awal saat 3 bulan sebelum tahun kedua kapal. Selama intermediate survey dapat dilengkapi hal – hal yang diperlukan, kapanpun sampai 3 bulan setelah tahun ketiga kapal. Klasifikasi akan secara otomatis tidak berlaku jika intermediate survey belum terselesaikan, dan tidak ada toleransi untuk itu.
(LR Rules & Regulation Part 1, Chapter 2, Section 3 ; 3.52,  Jan 2007)
3. Docking Survey
Dalam 5 tahun siklus survey, harus dilakukan docking survey sebanyak 2 kali. Dengan periode maksimum antara dua docking survey tidak melebihi 3 tahun. Salah satu dari docking survey tersebut akan bertepatan dengan special survey. Intermediate survey dapat diganti dengan In Water Survey (IWS), jika kapal telah memenuhi spesifikasi klas dan teregistrasi dengan notasi *IWS.
(LR Rules & Regulation Part 1, Chapter 2, Section 3 ; 3.53,  Jan 2007)
4. Special Surveys at five-yearly intervals
Semua kapal yang di class kan pada LR juga harus dilakukan Spesial survey sesuai dengan persyaratan yang diberikan pada Chapter 3. Survey ini dilakukan pada interval 5 tahun.an. 5 tahun pertama adalah terhitung dari tanggal kapal selesai dibangun / diserahkan dari pihak ship builder. dan 5 tahun berikutnya terhitung dari tanggal Special survey  yang sebelumnya. Pertimbangan dapat diberikan atas kebijaksanaan komite untuk setiap keadaan pengecualian yang memperbolehkan perpanjangan klasifikasi lambung kapal untuk maksimal tiga bulan di luar tahun kelima. Jika perpanjangan disetujui pada periode berikutnya klasifikasi lambung kapal akan terhitung dari tanggal jatuh tempo Spesial survey sebelum diberikan perpanjangan.
(LR Rules & Regulation Part 1, Chapter 2, Section 3 ; 3.59,  Jan 2007)
5. Complete Surveys of machinery at five-yearly intervals
Jatuh tempo Complete Survey dari permesinan pada interval lima-tahunan, survey yang pertama lima tahun dari tanggal pembangunan atau tanggal klasifikasi pertama seperti yang tercatat dalam Buku register, dan lima tahun selanjutnya terhitung dari tanggal Complete Survey sebelumnya. Pertimbangan dapat diberikan atas kebijaksanaan Komite untuk setiap keadaan pengecualian yang membenarkan perpanjangan dari survey class permesinan maksimum tiga bulan melampaui tahun kelima. Jika perpanjangan disepakati, periode berikutnya akan mulai dari tanggal jatuh tempo dari Complete Survey permesinan sebelum perpanjangan diberikan. Survei dapat dilakukan sebelum tanggal jatuh tempo tetapi tidak boleh lebih dari 12 bulan dari tanggal jatuh tempo, kecuali dengan persetujuan Komite. Apabila Complete Survey permesinan telah selesai dilakukan lebih dari tiga bulan sebelum tanggal jatuh tempo, dicatat tanggal penyelesaian akan menjadi tanggal akhir survei. Dalam semua kasus lain tanggal akan dicatat ulang tahun kelima.
(LR Rules & Regulation Part 1, Chapter 2, Section 3 ; 3.5.1.6,  Jan 2007)

Tuesday, 3 December 2013

Docking Survey

1.Preface 

This document describes the general background of a "Docking Survey," which has an important role in a classification survey, and is meant to be used as a reference for surveyors before they carry out field inspections.
This document was prepared by Ichiro Ishikawa, former Chief Surveyor, and is based on the prerequisites described below.

1-1. Underwater inspection

An underwater inspection that replaces a docking or slipway inspection which is carried out by a company approved by the Classification Society. The bottom shell, rudder and propeller should be inspected
indirectly by observing the television images transmitted by an underwater camera used by a diver.
Detection of abnormalities should fundamentally conform to the contents of this document; therefore, details of underwater inspection are not specially described here.

1-2.Method of repairing damage

Various types of damage, such as damage due to stranding and contact with the bottom shell, may be detected during a docking survey. Such damage is usually repaired by the shipowner under insurance, but in this document details of repairing methods will not be described. These tems will be introduced in the separate home page describing "Damage and Repair" in futuer.

1-3.  Propeller

The propeller and propeller shaft are inspected at the same time as a bottom inspection. However, shafts need not necessarily be inspected during a Docking Survey because "Propeller Shaft and Stern Tube Shaft Surveys" are independent from the Docking Survey under the responsibility of machinery surveyor but brief explanation is entered in this document.

1-4.  Anchor and Chain Cable

An inspection of the anchors and anchor chains is not a requirement of a Docking Survey; these items fall under the purview of a Special Survey. However, as it is customary to inspect these items during a Docking Survey, they are covered in this document.

1-5. Damages in Bottom

Except for defects that occur because of stranding and contact with objects or the sea bed, defects in the bottom shell, such as deformation and corrosion almost never occur unexpectedly; they occur gradually over a long period. Because the most repairs to the bottom shell involve repairs to double bottom tanks, considering that the tank should be emptied and cleaned before starting repairs and hydrostatic tests carried out after repairs, the period for repairs should be estimated aproximately. Therefore, the data below should be collected before performing a bottom survey.

1-6. Study the history of the ship

Before carrying out an inspection, have a look the survey report file submitted together with the survey request application, and check the recommendations and the precautionary items if any .And read old survey reports as far back as possible, at least until the previous bottom inspection. Dents in the bottom shell may be under- or over-estimated, or overlooked depending on the position to be inspected, increase or decrease in the intensity of light rays, and arrangement of blocks. Dents that have not appeared in reports in the last few years, may have been reported already in the past. There have been instances

1-7. Working Schedule

The schedule for docking , undocking and sailing dates are determined by the shipowner's sailing schedule and the shipyard's docking schedule; therefore, these informations should be obtained for reference. If the docking period is as short as two or three days, both shipowner and shipyard are unlikely to carry out the big repairs to the bottom or side shell unless the shell is heavily damaged. The docking period gives you an approximate idea of the extent of the bottom shell works that is likely to be carried out. Information such as the time the ship will be docked/undocked , how many hours does it take the dock will be dry, and capacity of discharge pumps of the dock should be obtained for reference.

1-8. Marine casualties

After the previous docking, instances where the ship hits the quay, or the bottom shell came in contact with the sea bed or floating objects, should be correctly entered in the log book. It is recommended to ask the superintendent or the Master about the instances of marine casualties before starting inspection . If there are any report of bottom contact, the bottom inspection should be carried out with special care; sometimes , In this case the major repairs to the bottom shell may be necessary. Another method of collecting data is to be request shipyard supervisor to show the specifications for repairs carried out to the ship, if possible.

Photo 1-1 ULCC in Dry Dock
One of the world largest ship, Piere Guillaumat in LISNAVE Margueira Yard in 1978 Dimensions Lpp 401.10 x B 63.01 x 35.92 m, DW 555,031t Built at the San Nazaire Ship Yard in France BV Class It takes more than 3 hours to carry out the bottom Survey.

2. Docking Survey

A docking survey is also called a bottom survey. According to the "Protocol of 1988 relating to the International Convention for the Safety of Life at Sea, 1974", a bottom inspection is defined by a lengthy expression: thst is, "Inspections of the outside of the ship's bottom". Area of the hull under the water-line are always immersed in water ; therefore, the condition of damage in the event of the stranding or bottom contact can not be observed. The objective of periodical docking is to inspect the area of hull beneath the water- line. Offshore structures in conrtast to a ship, do not sail throughout the world and suffer neither from stranding nor contacting with other object. Conversely, docking an offshore structure is very difficult; therefore, underwater inspection by an underwater camara inspection instead of docking is justifiable. There is no word corresponding to docking survey in the SOLAS Convention. But the Classification Sosieties request the periodical docking survey to the shipownes. According to their requirements ships must be in dry dock twice in 5years as shown in the following figure.
##
Before 1964 the docking survey was requested every year, because at the Annual survey, docking was requested. Some shipowners put their ships twice in the year. But now the docking is only 2times in 5years. The reason of this relaxation was the improvement of paint.  At that time the effectiveness of paints continued only one year or less. If the ship was not docked for more than one year, the paint would peel off and alrae and shellfishes would stick to the hull under the water line, resulting in a drop of the ship's speed . For the shipowners at that time decreased speed was bigger problem than the expence of docking.









Marine Survey Practice: Surveyor Guide Notes for Oil Tankers Survey

Marine Survey Practice: Surveyor Guide Notes for Oil Tankers Survey:

Surveyor Guide Notes for Oil Tankers Survey

An oil tanker, also known as a petroleum tanker, is a merchant ship designed for the bulk transport of oil. There are two basic types of oil tankers: the crude tanker and the product tanker. Crude tankers move large quantities of unrefined crude oil from its point of extraction to refineries. Product tankers, generally much smaller, are designed to move petrochemicals from refineries to points near consuming markets.
Oil tankers are often classified by their size as well as their occupation. The size classes range from inland or coastal tankers of a few thousand metric tons of deadweight (DWT) to the mammoth ultra large crude carriers (ULCCs) of 550,000 DWT. Tankers move approximately 2,000,000,000 metric tons (2.2×109 short tons) of oil every year. Second only to pipelines in terms of efficiency, the average cost of oil transport by tanker amounts to only two or three United States cents per 1 US gallon (3.8 L).
Some specialized types of oil tankers have evolved. One of these is the naval replenishment oiler, a tanker which can fuel a moving vessel. Combination ore-bulk-oil carriers and permanently moored floating storage units are two other variations on the standard oil tanker design. Oil tankers have been involved in a number of damaging and high-profile oil spills. As a result, they are subject to stringent design and operational regulations.

































Oil Tanker Double Hull Critical Area:





Marine Survey Practice: Preparation for Survey

Marine Survey Practice: Preparation for Survey:

Preparation for Survey


Before starting survey work, authorization and scope of inspections are to be clarified, the necessary tools and personal equipment items to be prepared, and the safety precautions are to be arranged.
1. REQUEST FOR SURVEYS
It is important that the procedures listed below are observed when a survey request is received and that they are carried out before the ship is visited for the survey.
1.1 Nominated surveyors or those that belong to an organization recognized by the Administration should check who requests the survey and ensure that they are authorized to do so. For example, a survey request may be made by:
  •  the owner or master of the ship (or his agent), for a periodical survey, including a mandatory annual survey and an intermediate survey, or occasional survey in the case of damage to the ship's structure or equipment;
  • the port State, for clarification of possible non-compliance of the ship's structure or its equipment; 
  • the Administration of a State whose flag the ship is entitled to fly, for verification of the ship's condition.
1.2 Ensure that it is known which international requirements, which national regulations and which other orders and decrees are applicable to the requested survey.
1.3 If necessary, contact the Administration or organization responsible for issuing SOLAS-related certificates to which special requirements and/or instructions apply, such as: 
  •  national requirements laid down by the Administration which are additional to the international convention, e.g. regarding a dead-man stopping device at winch controls etc., the use of asbestos, which is banned by many authorities although there may be varying interpretations of this ban, a remote starting of fire pumps on ships having unattended machinery space etc., 
  •  exemptions from the international convention's requirements, e.g. fixed fire extinguishing system of cargo holds, 
  •  different survey methods and procedures accepted by the national authority, e.g. in-water survey (divers' survey) instead of the dry-docking of a ship, and non-traditional methods of surveying machinery such as surveys based on condition monitoring, 
  •  different procedures for reporting to the Administration, to be followed by the surveyor.
If the request for a survey is made by the port State authority, the surveyor should obtain the full background to this request, including the authority's point of view, before visiting the ship.
1.4 Check and study the drawings, data, past survey records and reports, as far as necessary and at hand.
2. TOOLS AND EQUIPMENT
For hull surveying purposes a few personal standard parts are necessary for the surveyor, whereas for special inspections additional tools or checking devices may be required.
Surveyors must be familiar with the equipment and tools used in hull survey procedures. Ship equipment can be used, and in addition, a shipyard may provide necessary devices. Before using measuring devices, calibrations and zero adjustments should be carried out, if necessary.
2.1 Standard Equipment Personal Property

  • suitable working clothes
  • safety shoes
  • safety helmet
  • ear protectors
  • gloves
  • notebook for recording and/or small dicta-phone
  • ex-proof electric torch
  • test hammer
  • pocket measuring tape
2.2 Other Tools and Equipment Used in Survey

Testing hammer:
Note that hammers made of steel must not be used in gas dangerous or gas suspected areas. Here the use of alloy hammers/tools is required to avoid that sparks are initiated by hammering or when tools slip out of hand and fall down.

Measuring tools:
Dial gauges, welding gauges, and feelers may be required for measuring clearances, welding seam heights, indents or deflections of hatches etc.




Portable oxygen and explosive content meters are necessary in areas where petroleum liquids or others are carried and where compartments with limited oxygen content shall be inspected. If ship's instrument is used, proper calibration of the instrument should be confirmed by a suitable testing method or by the latest calibration record issued by a recognized testing firm.







Thickness measurement instruments:
Such instruments use ultrasonic testing methods and calibration of the instrument is usually built in, otherwise it must be gauged separately.



















Vibration measurement equipment usually available through a shipyard or at major offices or testing institutes is to be used with reference to the relevant instructions and application procedures. There are numerous devices developed and suitable for hull vibration measurements and for recording vibrations exercised by running machinery.
Camera:
Photographs can greatly aid proper reporting if a suitable camera is available. The use of flashlights, however, is limited in areas where explosion risk exists.
3. SAFETY PRECAUTIONS
The surveyor must pay due attention to his own personal safety as well as to that of other persons on board. The following is i.e. an extract from "Guidance Manual for the Inspection and Condition Assessment of Tanker Structures" (pages 3 ff). Sections 3.2 - 4.5 may serve as a guideline for general safety aspects when tankers and product carriers are inspected.
Safety during surveys:
Before commencing any survey, the owner and all personnel involved in the survey must ensure that appropriate safety procedures are specified.
Safety standards often vary from owner to owner and vessel to vessel. While many owners maintain strict onboard safety procedures, survey personnel including Classification Society surveyors and subcontractors must still be aware of what constitutes minimum acceptable standards for tanker inspection to protect themselves from potentially hazardous working conditions.
The following are items of special importance to survey personnel and are included here to highlight the key items of on-board safety. These reflect the present practices and should be treated as a guide rather than a safety standard.
3.1 Safety Meeting - General Considerations
Before beginning any survey the survey team should ensure that a safety meeting is held to discuss all aspects of safety referred to herein with special attention being paid to gas testing procedures, command and communication links, and rescue arrangements.
In pump rooms where cargo vapors may occur due to leakages, pump rooms should be ventilated at least 15 minutes before entering or before the pumps are started.
As most cargo vapors are heavier than air, lower explosive limits (LEL) and/or toxic concentration measurements have also to be taken at floor level and below if inspections are necessary in this area.

Compartments normally not entered, as cofferdams, pipe tunnels, etc., which has usually no fixed ventilation system, should be ventilated by portable equipment.
Especially double bottoms in chemical tankers or product carriers were a risk of minor leakages from cargo tanks above always exists, the double bottoms should be opened at both manhole covers forward and aft and thoroughly ventilated before entering. Then the contents of oxygen, petroleum vapors and/or possible toxic cargoes should be tested before making final access.
The first person entering such a compartment should use breathing apparatus and a life line suitably attached for emergency rescue. A standby team should be trained for this purpose.

A good practice prior to inspecting those double bottom tanks is to fill them with seawater, keep them filled, and pump it out directly before entering.


3.2 Gas Testing for Tank Entry
Entry of tanks for survey should not be permitted until testing indicates that the following criteria are met:
  •  Gas reading 1% Lower Explosive Limit (LEL) or less (by Explosimeter).
  • Maximum Benzene (C6H6) 10 ppm (by Draeger Tube or equal).
  • Maximum Hydrogen Sulphide (H2S) 10 ppm (by Draeger Tube or equal) (this figure is under review and likely to be lower).
  • Minimum Oxygen (02) 21% by volume (Oxygen Analyzer).
    Note: the TLV-TWA for hydrocarbon varies depending on the cargo carried for gasoline the TLV is 300 ppm corresponding to about 2% LEL. Therefore if the TLV-TWA is unknown, a value of about 150 ppm should be used.
  • Maximum Hydrocarbons no greater than the Threshold Limit Value - Time Weighted Average (TLV-TWA) for the actual mixture encountered (by Draeger Tube or equal).
  •  Other limits specific to dangerous cargoes (chemical products), if applicable.
For vessels with inert gas systems, trace amounts of various toxic gases may increase the hazard of exposure for personnel. Normally, a steady 21% by volume of oxygen reading will be sufficient to dilute these gases below their TLV's. However, personnel should be aware of the following limits:
  • Maximum Carbon Monoxide (CO) 50 ppm (by Draeger Tube or equal).
  • Maximum Nitrogen Dioxide (N02) 3 ppm (by Draeger Tube or equal).
  • Maximum Nitric Oxide (NO) 25 ppm (by Draeger Tube or equal).
-    Maximum Sulphur Dioxide (S02) 2 ppm (by Draeger Tube or equal).
If gas readings are greater than 1% LEL (Explosimeter), or if other limits are exceeded, the survey team should be instructed not to enter the tank or, if already in it, to stop working and immediately vacate the tank. The Explosimeter used should be calibrated with a low level full scale reading of O to 10% LEL.
The team should arrange with the master to have the tank frequently tested for gas at several locations, say every 2-3 hours. In addition, a member of the team should verify the readings from time to time.
To aid the detection of any local pockets of gas, or lack of oxygen, team members should be encouraged to carry portable hydrocarbon and oxygen detectors with audible alarm features.
3.3 Tank Preparation
Continuous forced ventilation should be supplied to the tank during the inspection. An adequate number of deck fans should be used to supply this air. The fans should, where possible, be ducted to supply fresh air to the tank bottom. The vent fans should be stopped during atmosphere checks. The inert gas fans should not be used to provide fresh air ventilation because contaminants from the inert gas lines could be introduced into the tanks. Inert gas branch lines should be blanked off and the blanking flange interlocks checked at each tank if entry is required while inerting, or gas freeing of other tanks is taking place, or if any other tanks are inerted or contain hydrocarbons.
An alternative to pipe blanking would be to remove a section of the branch line.
All cargo pipelines leading to the tank should be checked for oil content and the valves secured closed, immobilized and signposted. Any oil present in the lines should be removed.
All adjacent tanks should be in the same gas free condition as specified above or fully ballasted. Alternatively, and with the knowledge and approval of the owners and the agreement of the survey team, adjacent tanks may be fully inerted or partly ballasted/remainder inerted but with pressure reduced to a minimum. The survey team should be aware of the danger of potential leakage of inert gas through bulkhead fractures or faulty valves.
3.4 Safety Watch and Safety Equipment
The survey team should not remain in a tank unless there is a safety watch by ship's staff with at least one individual stationed at the tank hatch throughout the inspection. The safety watch should have the authority to order the evacuation of a tank and should be responsible for registering the survey team entering or leaving a tank. Communication should be maintained between the personnel in the tank and the safety watch. When underway, the safety watch should maintain communication with the bridge.
Rescue equipment including breathing apparatus, resuscitators, smoke masks, rescue lines, a stretcher, etc. should be laid out at the tank hatch or, if more than one tank is being worked, at a suitable central location on deck.
3.5 Tank Cleaning
Tanks and spaces to be surveyed must be sufficiently clean and free from water, scale, dirt and oil residues to reveal excessive corrosion, significant deformation, fractures, damages and other structural deterioration. Tank cleaning can be performed with an existing Crude Oil Washing (COW) system.
Generally, tank surveys should be avoided in tanks in which de-sludging operations are taking place since these operations can potentially raise gas levels.
3.6 Ballast Transfer
The survey team should not enter or remain in any tank if ballast is being moved in or out of that tank. Consideration should also be given to ballast movement in adjacent tanks.
3.7 Maneuvering
The survey team should not enter or remain in any tank while the ship is maneuvering in congested or confined waters.
3.8 Use of Ultrasonic Measuring Equipment in Cargo Tanks
Most ultrasonic thickness measuring equipment is not intrinsically safe. Its use is allowed only in tanks with a “hot work” certificate or, alternatively, where agreed by the owner, in tanks with gas quality meeting the requirements of section 3.2 above.
In this case, surfaces within cargo tanks that are not sufficiently cleaned of cargo residues are unacceptable for inspection and should be avoided by the survey team. If ultrasonic measurements are essential in such areas, the surface must be cleaned free of all residues for a radius of 1 meter from each reading point.
3.9 Temperature Extremes
When temperature extremes are expected during a survey, the inspection team should review the procedures that the master or safety officer will follow to monitor the exposure of the team to guard against hypothermia, frostbite, heat fatigue, heat stroke, etc.
When the limit are reached or exceeded, the team, in consultation with the master or safety officer, should adjust its work/rest period for the conditions being encountered. In hot climates the survey should be scheduled to avoid the midday heat when the above limit is likely to be exceeded. Some cooling can be achieved by spraying the decks with water during very hot weather.
3.10 Lighting
Whenever possible, natural lighting should be provided in the tank during surveys by opening all tank hatches. Suspended lighting should also be provided to supplement any natural lighting. Each person should carry a torch of the high intensity beam type such as a Wolflite or Halogen light. Torches and lights should be of intrinsically safe design
3.11 Rafting Surveys
Inflatable or rigid rafts should be of a type with sufficient compartment that adequate buoyancy and stability is provided even with one compartment ruptured.
At no time should the water level be allowed to be within one meter of the deepest under-deck web face flat.
Under no circumstances should the raft be used so that it is isolated from a tank hatch. In the case of tanks with swash bulkheads where two tank hatches are not fitted, the survey may be carried out using two rafts. One raft will be in use while the other is secured at the swash bulkhead for emergency escape.
Rafting should not be attempted if there is more than a thin sheet of oil on the water.
Rafting or boating should be discontinued if the rise and fall of the raft or boat within a cargo tank (due to the motion of ballast water caused by rolling) makes the operation difficult or hazardous. In making this decision, the team should consider the degree and period of roll, the proximity of rafting to the deck-head or other structure (that could damage the raft), and expected maneuvering that could add to excessive motion of the ballast water. While it is difficult to set a limit, the rise and fall of ballast water should not exceed one meter, equivalent to about 1.5 to 2 degrees of roll per side on a V/ULCC.
Once the type of survey has been decided upon, it is necessary to consider the means of access available to achieve the goals of the survey.
The need for reasonable access to the upper parts of a tank structure has recently been reinforced by the introduction of the IACS Unified Requirements for the Special Hull Surveys of Oil Tankers. These requirements do not stipulate how access is to be achieved but have specific requirements for close-up surveys of deck-head structure and primary ring structure coupled with thickness determination in these areas.
The following options are available to aid access to the structure for condition assessment:
4.1 Climbing
In general, the free climbing height should be limited to about 3 meters above the bottom or any large stringer platform. If it is necessary to exceed this height, there should be a water bottom to provide a “cushion” or other provisions such as safety lines. The free climbing height above the water surface should not exceed 6 meters.
When climbing in tanks containing water, the surveying personnel should wear “flotation aids”. A flotation aid is a simple form of lifejacket which does not impede climbing.
4.2 Permanent Arrangements
Much can be achieved at the design stage of a vessel by the provision of manholes and ladders. The width of face plates, the location of stringers, the provision of manholes etc., can all contribute to the ease with which a structure may be surveyed and the condition monitored in service.
Some shipbuilders fit limited permanent walkways at the upper parts of the tank either for their own use or at the request of an owner. Often use of existing structure is made for permanent walkways with handrails added. The fitting of such walkways will however incur a cost and deadweight penalty for the operator especially as the walkways themselves and supporting brackets must be substantial enough for the corrosion environment. Walkways can provide sufficiently close access to obtain a general assessment of the condition of the structure and identify suspect areas for closer examination.
4.3 Temporary Staging
Conventional temporary staging within a tank to gain access to deck-heads and bulkheads structure is an option that may be attractive in some circumstances but, as the vessel gets older and survey requirements more stringent, the cost of such staging methods could become prohibitive.
The use of temporary staging restricts the survey to being carried out within the repair yard and does not facilitate a survey at sea for preparation of repair specifications and the like.
4.4 Mobile Platforms
The most common form of temporary staging other than conventional scaffolding is the mobile platform. This consists of a portable, self-elevating platform suspended from wires through holes drilled in the upper deck. If a sufficiently extensive grid of holes is provided, reasonable access to deck-head areas can be achieved.
Alternative designs of mobile platform are mostly based upon an articulated or telescopic arm principle. Such designs would typically incorporate a support turret suspended from a tank cleaning opening or from the tank bottom. The articulated or telescopic arm is supported by the turret and is usually operated hydraulical1y or pneumatically to bring the inspection platform to the desired position. The movement of the platform can usually be controlled by the inspector on the platform. Each platform should be capable of carrying two persons and would typically have an outreach from the turret of about 25 meters.
All forms of mobile platform are highly susceptible to the motions of the vessel and are therefore more readily usable in dry-dock or sheltered conditions rather than at sea. it should be noted that these platforms may have to be certified as complying with local factory inspectorate and International Labor Organization (ILO) requirements, particularly when used within a repair yard.
4.5 Rafting
Although limited in use for some structural configurations, survey of deck-heads from a raft or boat within a partially filled tank is fairly common practice with some operators and is likely to become even more popular as more stringent survey requirements are introduced.
The tank should not be filled beyond a level approximately 1 meter below the deck transverse so that the survey team is not iso1ated from a direct escape route to the tank hatch. This will mean that on larger vessels with deep deck transverses the inspector will still be some distance from the deck-head which may preclude close-up survey.
Filling to levels above the deck transverses should only be contemplated if a deck access manhole is fitted in the bay being examined to provide access to the raft and direct escape to the deck in an emergency.
Fitting of additional deck manholes (with access ladders and platforms) for this purpose should possibly be considered on future designs if rafting is planned as the main means of deck-head survey.
Safety is of prime importance during ratting surveys and likely motions of the vessel must be taken into account at all times.
(Note: above sections 3 and 4 are grouped under the heading "Safety and Access" in Chapter 1 "Survey Preparation Guidelines").
4.6 Opening of manholes
For access to double bottom tanks, pipe tunnels, wing tanks, etc., both manholes should be opened and prepared.
It enables natural ventilation and easier means of escape, if necessary.
In addition, inspections are easier to perform if the tank passage can be made in one way only and when light and tools and fresh air are to be reached from short ends.